Guangzhou-Huizhou Expressway (BOT)

In 1998, CGCD invested in Guangzhou-Huizhou Expressway which is 153.2km long, including 7 grand bridges, 4 tunnels and 15 interchanges. This expressway is an important part of planning artery traffic network of china, and is opened to traffic in December 2003, whose mileage is the longest of one-time completion and opened to traffic in Guangdong Province.


Guangzhou-Wuzhou Expressway(BOT)

In 1998, CGCD invested in Guangzhou-Wuzhou Expressway which is 158km in total length and opened to traffic in June 2010.


Guangzhou – Foshan – Zhaoqing Expressway

Guangzhou-Foshan- Zhaoqing Expressway is 177.34km in total length. The survey and design work was commenced in January 2013. The project has been opened to traffic in December 2016.

The project is operated in “BOT + EPC” mode,a trial operation mode used in domestic construction which is more applicable and has more advantages than the traditional practice in cost, progress and quality.